DC Solar Combiner Box 1-32 Strings PV Combiner Box for Solar Panel
Basic Info
Model NO. | distribution box |
Type | Distribution Metering Box |
Structure | Protection |
Certification | ISO9001:2000, CCC, TUV CE CQC |
Form | All- packaged Type |
Operation Voltage | High Voltage |
Size | 1 Uint |
Application Range | Power Plants |
Shell Material | Plastic ABS |
Shell Protection Grade | IP65 |
Brand | Pinji |
Name | PV Combiner Box |
Input Current of Each Circuit | 20A |
Maximum Output Switching Current | 40A |
Strings | 2 |
Voltage | 1000V |
Transport Package | Paper /Wooden Carton |
Specification | 300*260*140mm |
Trademark | PINJI |
Origin | China |
HS Code | 8537109090 |
Production Capacity | 500PCS/Month |
Product Description
Name | PV combiner box | |
System maximum de voltage | 1000 | |
Maximum input current for each string | 20A | |
Maximum input strings | 2 | |
44Maximum outpui switch current | 40A | |
Number of invener MPPT | 1 | |
Number of Outpui strings | 1 | |
Category of test | II grade protection | |
Nominal discharge current | 20kA | |
Maximum discharge current | 40kA | |
Voltage protection level | 3.8kV | |
Maximum continuous operating voltage Uc | 1000V | |
Poles | 3P | |
Structure characteristic | Plug-push module | |
Operating Temperalure | Wall mourning type | |
Installation method | Wall mourning type |
Hot productsCompany Profile
FAQ
Q1:.What is working time?
A:08:30-17:00 (GMT+8 Beijing), from Monday to Saturday.24 Hours customerserviceFor any query or problem , please contact us :
Q2: Will my drawing be safe after you get it?
A:Yes, we will not release your design to third party unless with your permission. And wecan sign the NDA before you send the drawing.
Q3: What is the MOQ?
A: Usually we don't set MOQ, but the more, the cheaper. Besides, we are happy to makeprototype or sample for clients to ensure quality standard.
Q4:Whether some samples can be provided?
A: Yes, We can supply the sample if we have ready parts in stock, but the customers haveto pay the sample cost and the courier cost.
Q5: What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the productsand packages before you pay the balance.
Q6: How about your delivery time?
A: Generally, it will take 5-7 days after receiving your advance payment. The specific deliverytime depends on the items and the quantity of your order